There is very heavy traffic on the Dartford crossing this morning due to an earlier broken down vehicle.

All lanes have re-opened, however this has left residual queuing.

The lorry broke down early this morning on anticlockwise from M25 J1A (Swanscombe) to M25 J31 (Lakeside / Purfleet).

Lane one (Of two) was closed for the left hand tunnel, the tunnel was briefly closed.

The right hand tunnel (Which is the taller of the two) remains open.