The brakes of a double decker bus locked between junction 3 and junction 2 of the M25 grinding it to a halt. 

Hydraulic fuel spilt across the four lane carriageway. 

Traffic wasn't able to pass the broken down bus stuck near the Darenth interchange today (December 1).

News Shopper:
A spokesman for Highways England said: "At 12.35pm this afternoon a double decker bus' breaks locked.

"It was in the inside lane of the four along the M25.

"A traffic officer tried to release the breaks but it didn't work."

The lane was cleared one hour later at 1.32pm.